Renovation estimate worksheet

Compare the work behind each contractor quote.

Put up to three estimates side by side. Add a figure only when you can support the extra cost for excluded work or an allowance shortfall, then see which scope questions still need an answer.

Enter the written estimates

Use the same project scope and currency for every quote.

Runs in this browser
This changes how totals are displayed. It does not convert amounts.
Enter the written estimate before any adjustments below.
Enter only the extra amount above the quote; leave blank if you cannot support a figure.
Enter the written estimate before any adjustments below.
Enter only the extra amount above the quote; leave blank if you cannot support a figure.
Leave the estimate and label blank if you have only two.
Enter only the extra amount above the quote. This field is optional when Estimate C is not used.

Check whether each quote covers the same work

For each item, mark what the written estimate says. “Unclear” is useful information; ask before assuming it is included.

Work itemEstimate AEstimate BEstimate C
Site protection and preparation
Removal, demolition, and disposal
Materials, product model, and finish
Labor and installation
Repairs that may be found after work starts
Permits, inspections, and delivery
Cleanup and closeout
Schedule and warranty terms stated
Keep the adjustment honest. For excluded work, enter only a cost not already included in the quote. For an allowance, enter only the expected top-up above the allowance already included. Never add the full material or labor amount a second time. If you cannot support a figure, leave it blank and keep the scope item visible as “Unclear,” “Excluded,” or “Allowance.”
No quote data is uploaded or saved.

Formula
Known adjusted total = written quote + known extra for excluded work or allowance shortfall
Scope flags are displayed separately and do not change the arithmetic.

Why two estimates can have different totals

A headline price is only comparable when the estimates cover substantially the same work. One bid may include demolition and disposal while another leaves them to the homeowner. A material allowance may be a placeholder rather than the price of the product you selected. A short estimate may also leave permits, delivery, cleanup, or repairs discovered after opening a wall unresolved.

The Federal Trade Commission recommends getting multiple written estimates and says an estimate should describe the work, materials, completion date, and price. It also advises checking applicable licensing and insurance with state or county officials. Requirements differ by location, so verify the rules that apply to your project. Read the FTC’s home-improvement guidance.

How to use this worksheet

  1. Use estimates for the same project and currency. Give each one a label you will recognize.
  2. Enter each written total. Mark what the estimate says about the work items; do not assume a blank line means “included.”
  3. Add an amount only for excluded work or an allowance top-up you can support. Leave unknown work out of the total and keep it visible as an open question.
  4. Ask contractors to clarify allowances, exclusions, who handles permits, the schedule, payment milestones, and how changes are priced. Keep the answer with the written estimate.
  5. Compare scope, timing, warranty language, and payment terms along with price. A low total is not proof that two bids are equivalent.

What this tool can and cannot tell you

The calculator adds only the figures you provide. It does not supply a fair market price, convert currencies, estimate a missing line item or allowance top-up, verify licenses or insurance, or assess a contractor’s reliability. It does not decide whether contract wording complies with local law. Ask the relevant local authority or a qualified professional about requirements for your location and project.

Entries stay in the current page session and are not sent to a quote-pricing service. Read the privacy notice, calculation method, and disclaimer. For a broader household plan, try the maintenance reserve calculator or the repair-or-replace calculator. Source checked October 2, 2026.